| Project: | THUAN PHUONG ROOFTOP SOLAR POWER |
| Capacity: | 506.88 kWp |
| Location: | Long Cang Commune, Can Duoc District, Long An Province, Vietnam |
| Commercial Operation Date: | May 31, 2024 |

| Project: | THUAN PHUONG ROOFTOP SOLAR POWER |
| Capacity: | 506.88 kWp |
| Location: | Long Cang Commune, Can Duoc District, Long An Province, Vietnam |
| Commercial Operation Date: | May 31, 2024 |
