{"id":3395,"date":"2025-10-23T17:44:05","date_gmt":"2025-10-23T10:44:05","guid":{"rendered":"https:\/\/insenergy.vn\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/"},"modified":"2025-10-23T17:44:05","modified_gmt":"2025-10-23T10:44:05","slug":"grid-connection-and-bi-directional-meters-2025-technical-regulation-updates","status":"publish","type":"post","link":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/","title":{"rendered":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates"},"content":{"rendered":"<p style=\"text-align: justify;\">When a solar power system is installed at a factory or workshop, grid connection becomes mandatory for the facility to synchronize with the national grid and register its surplus generation.<span style=\"font-weight: 400;\"> This not only helps the enterprise harness renewable energy but also opens up the possibility of selling surplus electricity, creating an additional revenue stream. <\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The use of a bi-directional meter is a key component in completing this technical and legal process. The meter measures both the electricity drawn from the grid (consumption) and the electricity exported from the solar system (export)\u2014thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility. <\/span><\/p>\n<h2 style=\"text-align: justify;\"><b>New 2025 Technical Regulations Businesses Must Know<\/b><\/h2>\n<figure id=\"attachment_3392\" aria-describedby=\"caption-attachment-3392\" style=\"width: 1020px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-3392 size-large\" src=\"http:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3-1024x768.webp\" alt=\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates\" width=\"1020\" height=\"765\" srcset=\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3-1024x768.webp 1024w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3-300x225.webp 300w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3-768x576.webp 768w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3-1536x1152.webp 1536w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3-600x450.webp 600w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-3.webp 2048w\" sizes=\"(max-width: 1020px) 100vw, 1020px\" \/><figcaption id=\"caption-attachment-3392\" class=\"wp-caption-text\">Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">According to Decree 58\/2025\/ND-CP and guiding documents from Vietnam Electricity (EVN), rooftop solar power systems connecting to the grid must comply with the following regulations:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The connection system must feature a bi-directional meter that is compliant with measurement standards and capable of continuous data transmission, ensuring transparency of all electricity purchased and sold.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">For rooftop solar systems eligible for grid connection, the surplus electricity exported to the grid must not exceed 20% of the total monthly generated output.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The metering system must have remote data transmission capabilities (as a &#8220;smart meter&#8221;) and meet &#8220;smart-grid&#8221; requirements. Under the roadmap to 2030, traditional mechanical meters will be gradually phased out.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The connection application procedure includes: submitting a technical file (drawings, equipment specifications), a connection point survey, signing a power purchase agreement (if surplus power is sold), technical commissioning, and finally, grid synchronization.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><b>The Technical Process Businesses Need to Understand<\/b><\/h2>\n<figure id=\"attachment_3390\" aria-describedby=\"caption-attachment-3390\" style=\"width: 640px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-3390 size-full\" src=\"http:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-4.webp\" alt=\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates\" width=\"640\" height=\"480\" srcset=\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-4.webp 640w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-4-300x225.webp 300w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-4-600x450.webp 600w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><figcaption id=\"caption-attachment-3390\" class=\"wp-caption-text\">Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">To ensure the system is grid-tied and metered correctly, the following steps are crucial:<br \/><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Step 1: Register the Connection Request &#8211; The business submits an application to the local power utility, including proposed capacity, connection point, and preliminary diagrams.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"> Step 2: Survey &amp; Technical Agreement &#8211; The power utility inspects the transformer, power lines, and distribution capacity to determine a suitable connection point.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"> Step 3: Install Bi-directional Meter &amp; Metering System &#8211; The meter is installed at the connection point to accurately measure all purchased and exported electricity.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"> Step 4: Commissioning and Grid Synchronization &#8211; Verify voltage, current, performance, and connections, then sign the official acceptance record before synchronizing with the grid.<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\"> Step 5: Monitoring and Reporting &#8211; The business must ensure metering data is transmitted to the power utility&#8217;s management system and is available for internal reports and ESG documentation.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><b>Specific Benefits of Following the Correct Procedure <\/b><\/h2>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">When a solar power system is connected and metered to standard, the business can legally and transparently sell surplus power exported to the grid. The bi-directional meter provides an accurate record of consumption and generation, which is the basis for EVN to pay for the renewable energy, creating a stable new revenue stream for the business. This also helps shorten the investment payback period, increasing the project&#8217;s economic efficiency.  <\/span><\/p>\n<figure id=\"attachment_3386\" aria-describedby=\"caption-attachment-3386\" style=\"width: 1020px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-3386 size-large\" src=\"http:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2-1024x768.webp\" alt=\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates\" width=\"1020\" height=\"765\" srcset=\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2-1024x768.webp 1024w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2-300x225.webp 300w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2-768x576.webp 768w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2-1536x1152.webp 1536w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2-600x450.webp 600w, https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-2.webp 2048w\" sizes=\"(max-width: 1020px) 100vw, 1020px\" \/><figcaption id=\"caption-attachment-3386\" class=\"wp-caption-text\">Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates<\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">The data recorded by the bi-directional meter helps the business monitor system performance and serves as a basis for ESG reports and energy audits. A valid commissioning and connection record is a mandatory legal condition for the system to be allowed to synchronize with the grid and operate stably. By strictly adhering to the process, businesses not only ensure technical safety but also avoid the risk of penalties or operational disruptions due to non-compliance.  <\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"font-weight: 400;\">Businesses should prioritize partnering with contractors or EPC units who have experience implementing solar power projects and a firm grasp of EVN&#8217;s connection and commissioning procedures. A professional partner will assist the business in completing all technical documentation, detailed drawings, and ensuring the grid synchronization process is safe, secure, and legally compliant. <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>When a solar power system is installed at a factory or workshop, grid connection becomes mandatory for the facility to synchronize with the national grid and register its surplus generation. This not only helps the enterprise harness renewable energy but also opens up the possibility of selling surplus electricity, creating an additional revenue stream. The &#8230;<\/p>\n","protected":false},"author":123457,"featured_media":3389,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[54,69],"tags":[],"class_list":["post-3395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kien-thuc-nang-luong-en","category-tin-tuc-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates<\/title>\n<meta name=\"description\" content=\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates\" \/>\n<meta property=\"og:description\" content=\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/\" \/>\n<meta property=\"og:site_name\" content=\"Insenergy\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-23T10:44:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"711\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/\",\"url\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/\",\"name\":\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates\",\"isPartOf\":{\"@id\":\"https:\/\/insenergy.vn\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp\",\"datePublished\":\"2025-10-23T10:44:05+00:00\",\"dateModified\":\"2025-10-23T10:44:05+00:00\",\"author\":{\"@id\":\"https:\/\/insenergy.vn\/#\/schema\/person\/49d796d640452f82ec64c7966776e2fd\"},\"description\":\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility.\",\"breadcrumb\":{\"@id\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#primaryimage\",\"url\":\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp\",\"contentUrl\":\"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp\",\"width\":711,\"height\":533,\"caption\":\"\u0110\u1ea5u n\u1ed1i l\u01b0\u1edbi v\u00e0 c\u00f4ng t\u01a1 hai chi\u1ec1u: quy \u0111\u1ecbnh k\u1ef9 thu\u1eadt c\u1eadp nh\u1eadt n\u0103m 2025\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/insenergy.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/insenergy.vn\/#website\",\"url\":\"https:\/\/insenergy.vn\/\",\"name\":\"Insenergy\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/insenergy.vn\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/insenergy.vn\/#\/schema\/person\/49d796d640452f82ec64c7966776e2fd\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/insenergy.vn\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ab4b2b0a4a1ddb70a519d5bc902c0066?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ab4b2b0a4a1ddb70a519d5bc902c0066?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\/\/insenergy.vn\/en\/author\/insenergy\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates","description":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/","og_locale":"en_US","og_type":"article","og_title":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates","og_description":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility.","og_url":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/","og_site_name":"Insenergy","article_published_time":"2025-10-23T10:44:05+00:00","og_image":[{"width":711,"height":533,"url":"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp","type":"image\/webp"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/","url":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/","name":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates","isPartOf":{"@id":"https:\/\/insenergy.vn\/#website"},"primaryImageOfPage":{"@id":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#primaryimage"},"image":{"@id":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#primaryimage"},"thumbnailUrl":"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp","datePublished":"2025-10-23T10:44:05+00:00","dateModified":"2025-10-23T10:44:05+00:00","author":{"@id":"https:\/\/insenergy.vn\/#\/schema\/person\/49d796d640452f82ec64c7966776e2fd"},"description":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates thereby ensuring data transparency and protecting the interests of both the enterprise and the distribution utility.","breadcrumb":{"@id":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#primaryimage","url":"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp","contentUrl":"https:\/\/insenergy.vn\/wp-content\/uploads\/2025\/10\/dau-noi-luoi-va-cong-to-hai-chieu-1.webp","width":711,"height":533,"caption":"\u0110\u1ea5u n\u1ed1i l\u01b0\u1edbi v\u00e0 c\u00f4ng t\u01a1 hai chi\u1ec1u: quy \u0111\u1ecbnh k\u1ef9 thu\u1eadt c\u1eadp nh\u1eadt n\u0103m 2025"},{"@type":"BreadcrumbList","@id":"https:\/\/insenergy.vn\/en\/grid-connection-and-bi-directional-meters-2025-technical-regulation-updates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/insenergy.vn\/en\/"},{"@type":"ListItem","position":2,"name":"Grid Connection and Bi-Directional Meters: 2025 Technical Regulation Updates"}]},{"@type":"WebSite","@id":"https:\/\/insenergy.vn\/#website","url":"https:\/\/insenergy.vn\/","name":"Insenergy","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/insenergy.vn\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/insenergy.vn\/#\/schema\/person\/49d796d640452f82ec64c7966776e2fd","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/insenergy.vn\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ab4b2b0a4a1ddb70a519d5bc902c0066?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ab4b2b0a4a1ddb70a519d5bc902c0066?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/insenergy.vn\/en\/author\/insenergy\/"}]}},"_links":{"self":[{"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/posts\/3395"}],"collection":[{"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/users\/123457"}],"replies":[{"embeddable":true,"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/comments?post=3395"}],"version-history":[{"count":0,"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/posts\/3395\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/media\/3389"}],"wp:attachment":[{"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/media?parent=3395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/categories?post=3395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/insenergy.vn\/en\/wp-json\/wp\/v2\/tags?post=3395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}