RTI Vietnam Company Limited
Total Capacity  1249.16Wp
Investor CME Solar
EPC General Constractor INS Energy
Location Protrade International Industrial Zone, Street 2A, Bencat, Binhduong, Vietnam
Time 01/2022 - 03/2022

INS Energy is proud to be an EPC general contractor with many years of experience and proven reputation in the field of design, installation and operation of solar power systems in Vietnam.

With the goal of becoming a leader in providing solutions and products in the field of clean energy and renewable energy, INS Energy has built and developed a team of managers, engineers, and employees. well-trained, rich in practical experience, and constantly improving processes, technology and equipment over the years.

In addition, after more than 5 years of establishment and development, INS Energy's energy products and solutions have participated in many large projects. Currently, we have been and continue to develop a network with more than 100 distribution & installation partners nationwide, ready to meet all needs of domestic and foreign customers in a comprehensive and optimal way.

Investment Opportunities
Realizing the load potential of the RTI Vietnam company (over 1 billion VND per month on electricity bill), along with the ground and roof structure of the station, it is very convenient for the investment in the rooftop solar system, so the investor CME Solar has come to the decision to invest in a rooftop solar system that combines selling electricity to RTI Vietnam company to use for their business.

INS Energy is proud to be the unit trusted and accompanied by CME for many years, in charge of the EPC general contractor in the design, installation and operation projects of large capacity solar power systems.
Values brought
The project, after energizing and putting into operation, has met the expectations of the investor and the rooftop owner in terms of technical quality, efficiency, and power output as committed. At the same time, it also solves all the challenges posed.
The outstanding performance of the project
Average energy yield 1.6 GWh/year
Reduce CO2 emissions by more than 1.4 tons/year
The payback period is only 4.5 - 5 years.